Project Execution of Mega-Projects for the Oil and Gas Industries

Send to friend
 
Title: Project Execution of Mega-Projects for the Oil and Gas Industries
Author: Soosaiya Anthreas
ISBN: 0367675269 / 9780367675264
Format: Soft Cover
Pages: 208
Publisher: CRC Press
Year: 2023
Availability: 15-30 days
     
 
  • Description
  • Contents

This book covers execution of mega industrial projects especially in oil and gas industries covering engineering, procurement, construction, commissioning and performance testing. It enumerates various tasks and deliverables under each discipline and sub-disciplines to define the detailed scope of work, supplies and services, as per level III of Prima Vera Schedule developed from the contract-based schedule. It gives an overall idea of how a project rolls out from commencement date to initial acceptance and executed practically with total contractor’s scope of work broken down into tasks/activities at level III platform, while highlighting that support for fool proof project execution.

Preface

Section I : Planning and Execution  in Level 3
Chapter 1 :
Management, Control and Administration
Chapter 2 : HSE, Social and Security
Chapter 3 : Services and Facilities to Owner
Chapter 4 : Engineering
Chapter 5 : Procurement and Supply
Chapter 6 : Transport, Logistic and Storage
Chapter 7 : Construction
Chapter 8 : Pre-Commissioning
Chapter 9 : Commissioning, Start-up and Performance Test
Chapter 10 : Temporary Facilities

Section II : Commercial Aspects
Chapter 11 :
Commencement Date and Effective Dates
Chapter 12 : Extension of Time
Chapter 13 : Professionally Handling Large Claims
Chapter 14 : Prolongation and Disruption Costs
Chapter 15 : Penalty/Interest for Payment Delays
Chapter 16 : Force Majeure
Chapter 17 : Concurrent Delays
Chapter 18 : Hedging against Currency Fluctuations
Chapter 19 : Indemnity
Chapter 20 : Consequential, Indirect Damages
Chapter 21 : Laws and Regulations
Chapter 22 : Escalation
Chapter 23 : Liens
Chapter 24 : Total Liability
Chapter 25 : Payment Terms
Chapter 26 : Planning
Chapter 27 : Progress Measurement
Chapter 28 : EOT claim
Chapter 29 : Interpretation Rules
Chapter 30 : Change/Variations/Trend Notices
Chapter 31 : Contract Price below Floor Price and Consequences
Chapter 32 : Owner’s Delay on Document Approval
Chapter 33 : Insurances

Section III : Technical Aspects
Chapter 34 :
Life Cycle Cost Analysis (LCCA)
Chapter 35 : Consequences of Delayed Rigless Test on Wells (Owner Delays)
Chapter 36 : Strategy for using Non-Spec Feedstock for Commissioning
Chapter 37 : Gas In and Authority Check points
Chapter 38 : Value Engineering
Chapter 39 : Design Defect, Construction Defect and Damages
Chapter 40 : NDT (Non-Destructive Testing)
Chapter 41 : Destructive Testing
Chapter 42 : Hydrostatic Leak Test
Chapter 43 : Heavy Lift Load Sharing for Cranes

Section IV : Glossary of Abbreviations, Names and Meaning
Appendix

  • Project Organization
  • Contract Price Weight Factor
  • Monthly Status Report Contents
  • Material Requisition Cycle(MR)
  • FEED Deliverable List
  • Process Block Flow Diagram
  • Document Categories
  • Claims and Liens Release Letter
  • Prolongation and Disruption Cost: Hudson formula
  • A typical list of Procedures and Plans
  • Total Plant Break down into Areas


Index

 
 
 