Welcome Guest
  |   0 items in your shopping cart
 

BROWSE BY STANDARDS

BROWSE BY CATEGORY

***
 
 
Join our mailing list to recieve newsletters
 

Lesotho Highlands Water Project

Send to friend
 
Title: Lesotho Highlands Water Project
Author: Civil Engineering Special Issue
ISBN: 0727726218 / 9780727726216
Format: Soft Cover
Pages: 72
Publisher: Thomas Telford
Year: 1997
Availability: Out of Stock
     
 
  • Description
  • Contents

This £2 billion project ranks among the largest civil engineering projects in the world. This special issue describes the critical first phase (IA) which will supply 18 m /s of water to the industrial heartland of South Africa, and 72 MW of electricity to Lesotho.

Written by senior members of the multinational project team, the papers cover the planning, project management, design and construction of phase IA including the 185m high concrete-arch Katse Dam, and 82 km long 5m diameter transfer and delivery tunnel and the 'Muela' hyropower station.

Preface

Chapter 1 : Introduction
Chapter 2 : Lesotho Highlands Water Project : Project Management
Chapter 3 : Lesotho Highlands Water Project : Design and Construction of Katse Dam
Chapter 4 : Lesotho Highlands Water Project : Design and Construction of Transfer Tunnel
Chapter 5 : Lesotho Highlands Water Project : Design of The 'Muela Hydropower Station
Chapter 6 : Lesotho Highlands Water Project : Design And Construction of The Delivery Tunnel

Index

 
 
 
About Us | Contact us
loading...
This page was created in 1.1021118164062 seconds