Welcome Guest
  |   0 items in your shopping cart
 

BROWSE BY STANDARDS

BROWSE BY CATEGORY

***
 
 
Join our mailing list to recieve newsletters
 

Electric Utility Resource Planning : Economics, Reliability, and Decision-Making, 2nd Edition

Send to friend
 
Title: Electric Utility Resource Planning : Economics, Reliability, and Decision-Making, 2nd Edition
Author: Steven Sim
ISBN: 1032294191 / 9781032294193
Format: Hard Cover
Pages: 429
Publisher: CRC Press
Year: 2024
Availability: 2 to 3 weeks
     
 
  • Description
  • Contents

In 2012, using easy-to-understand text and examples, the first edition of this book explained how electric utilities “work,” and how they plan (or should plan) for the future, by:

  • "Creating" a hypothetical electric utility
  • Explaining how (and why) this utility will operate its system of generating units
  • Guiding readers through a planning analysis for the utility, examining various resource options (solar, new gas-fueled generation, and conservation)
  • Introducing four Fundamental Principles of Resource Planning that should guide utilities as they plan for the future

The first edition material, with significant updates, now appears as Part I of the second edition of this book. Part II of this book then presents six all-new chapters that address the challenges (and opportunities) of moving toward a zero-carbon future. Using the same hypothetical utility, with its new goal to utilize solar and batteries to serve 100% of its customers’ energy with zero carbon emissions by a future “target”year, Part II of this book addresses many subjects, including:

  • The enormous amount of MW of new solar and batteries the utility will need to add
  • Why certain characteristics of new solar and battery additions change as increasing amounts of these resources are added
  • In the years prior to achieving its zero-carbon goal, how the hourly operation of the utility’s existing fossil-fueled generators, plus the new solar, will change (and why the stability of the transmission grid will be challenged)

With this second edition, author Dr. Steven Sim again applies the experience and insights he gained from more than 30 years of resource planning for Florida Power & Light (FPL). As one of the largest electric utilities in the United States, FPL has faced a multitude of resource planning challenges, including how to get to zero carbon. During this time period, Dr. Sim performed and directed thousands of analyses designed to address these challenges. He also served as an expert witness in dozens of regulatory hearings, addressing both the economics of resource options and the non-economic impacts (air emissions, system reliability, fuel usage, etc.) associated with these options.

Acknowledgements
Author

Part I : The Fundamentals of Electric Utility Resource Planning
Chapter 1 :
Introduction
Chapter 2 : How Does an Electric Utility Actually "Work"?
Chapter 3 : Overview of Utility Resource Planning
Chapter 4 : Reliability Analyses for Our Utility System
Chapter 5 : Resource Option Analyses for Our Utility System : Supply Options
Chapter 6 : Resource Option Analyses for Our Utility System : DSM Options
Chapter 7 : Final Resource Option Analyses for Our Utility System
Chapter 8 : Are We Done Yet? Other Factors Than Can (and Will) Complicate

Part II : Moving Towards Zero Carbon
Chapter 1 :
An Overview of Part II
Chapter 2 : Moving Towards Zero Carbon : How Many MW of New Resources Will Be Needed?
Chapter 3 : Moving Towards Zero Carbon : Resource Planning Considerations for Solar (PV) Resources
Chapter 4 : Moving Towards Zero Carbon : Resource Planning Considerations for Battery Storage Resources
Chapter 5 : Moving Towards Zero Carbon : Ramifications for System Operations and Transmission Planning
Chapter 6 : Final Thoughts (Including Some Opinions)

Appendix A : Four Fundamental Principles of Electric Utility Resource Planning
Appendix B : Glossary of Terms
Appendix C : Mini-Lesson #1 : Concepts of Revenue Requirements, Present Valuing of Costs and Discount Rates, Cumulative Present Value of Revenue Requirements (CPVRR), and Levelized Costs
Appendix D : Mini-Lesson #2 : Further Discussion of the Limitations of a Screening Curve Analytic Approach
Appendix E : Mini-Lesson #3 : Further Discussion of the RIM and TRC Preliminary Cost-Effectiveness Screening Tests for DSM
Appendix F : Mini-Lesson #4 : How Can a Resource Option Result in Lower Costs, but Increase Electric Rates?
Appendix G : Mini-Lesson #5 : How Can a Resource Option That Produces Emissions Lower a Utility’s Total System Emissions?
Index

 
 
 
About Us | Contact us
loading...
This page was created in 0.30902099609375 seconds