Welcome Guest
  |   0 items in your shopping cart
 

BROWSE BY STANDARDS

BROWSE BY CATEGORY

***
 
 
Join our mailing list to recieve newsletters
 

CPM in Construction Management, 8th Edition

Send to friend
 
Title: CPM in Construction Management, 8th Edition
Author: Fredric L. Plotnick, James J. O'Brien
ISBN: 1259587274 / 9781259587276
Format: Hard Cover
Pages: 736
Publisher: McGraw-Hill
Year: 2015
Availability: Out of Stock
     
 
  • Description
  • Contents

Advance Your Construction Projects with CPM and this Fully Updated Guide

Plan, schedule, and manage construction projects using the critical path method (CPM) and the practical information contained in this thoroughly revised book. Written by two experienced engineers and authors, CPM in Construction Management, Eighth Edition, explains the evolution of CPM and fully covers the latest techniques, standards, and tools. The “John Doe” case study is used throughout to illustrate important functions, including acquiring and building the logic plan, navigation and best use of multiple software products, updating, cost control, resource planning, and delay evaluation.

This updated, hands-on guide shows how CPM:

  • Works - and how to make it work for you
  • Serves as the analytical tool of choice for evaluation, negotiation, resolution, and/or litigation of construction claims
  • Cuts costs in a one-person operation or the most complex multinational enterprise
  • Helps you stay on top of every aspect of complicated projects
  • Saves big money in delay avoidance, accurate cost predictions, and claims reductions
  • Multiplies the effectiveness of your instincts, experience, and knowledge
  • Can be successfully implemented by properly utilizing the power of leading scheduling software products

Access to electronic content includes:

  • A full-feature copy of Deltek’s Open Plan CPM software - a $2000 value
  • Sample files of the “John Doe” project readable by a variety of software products
  • Full color and scalable copies of all screenshots contained in the text
  • Additional legacy and up-to-the-moment chapters

Preface

Part 1 : Introduction to CPM Planning and Scheduling
Chapter 1 :
Introduction to Logic Based Planning and Scheduling
Chapter 2 : The Pure Logic Diagram
Chapter 3 : The Durations of the Logic Network
Chapter 4 : Example Project: The John Doe Project
Chapter 5 : Output of Calculations
Chapter 6 : Cranking the Engine
Chapter 7 : Adding Complexity
Chapter 8 : PERT, SPERT, and GERT
Chapter 9 : PDM and Precedence Networks
Chapter 10 : Respecting the Power of PDM
Chapter 11 : RDM Networks Restore the Promise
Chapter 12 : Overview of Prevalent Software Products

Part 2 : The Tools of CPM Planning and Scheduling
Chapter 13 :
Measure Twice - Cut Once
Chapter 14 : Choosing Codes
Chapter 15 : Acquiring Information for Initial Schedule
Chapter 16 : Specifying Restraints
Chapter 17 : Acquiring the Durations

Part 3 : The Practice of CPM Planning and Scheduling
Chapter 18 :
Evolution of the Project Schedule
Chapter 19 : Equipment and Workforce Planning
Chapter 20 : Procurement and Preconstruction
Chapter 21 : CPM and Cost Control
Chapter 22 : Enterprise Scheduling

Part 4 : The Practice of CPM Scheduling
Chapter 23 :
Converting the Team Plan to the Calculated Schedule
Chapter 24 : Engineer’s Review of the Submitted Initial CPM
Chapter 25 : Updating the Schedule
Chapter 26 : Revising the Logic Network
Chapter 27 : Engineer’s Review of the Submitted Update or Revision
Chapter 28 : Case Histories

Part 5 : Legal Issues
Chapter 29 :
Specifying the CPM
Chapter 30 : Sample CPM Specification: A Guideline for Preparing Your Own Specification
Chapter 31 : Unified Facilities Guide Specification
Chapter 32 : CPM in Claims and Litigation
Chapter 33 : Delay Analysis
Chapter 34 : Disruption Analyses
Chapter 35 : Other Claim Methods
Chapter 36 : Conclusion

Appendix Navigating the Virtual CD-ROM
Index

 
 
 
About Us | Contact us
loading...
This page was created in 0.17310690879822 seconds